Monday, March 7, 2011

McKinnon Master Bath

Meredith McKinnon wasn’t happy with the Master Bath of her new home.  She wanted more space, something more functional, and something a little more contemporary.  She came to Jeff with her plans he was able to bring them to life, along with a few personal touches. With the mix of ideas we were able to create a contemporary master with so much more to offer, and subtle accents that really make this room pop.

  1004101153b    IMG_0068

Vanity:      BEFORE

The Counter Top was faux-marble plastic resin that was resurfaced white by the previous owners instead of replacing.  And the cabinetry had years of wear and tear and had multiple layers of paint. All hardware and plumbing fixtures were original and outdated gold. As you can see the lighting was in need of an update as well, and there was only one power source located on the far right of the vanity. The mirror was framed with a cheap gold frame that needed to go.

       rotate_1004101153      IMG_0067

Shower:      BEFORE

As you can see there is limited shelving, outdated plumbing fixtures, a leaky pre-made shower pan, and very generic tile lacking character.  The shower glass framing was very cheap and again gold.

  1004101153a    IMG_0069

Bathtub:        BEFORE

The tub looked incomplete, and had an unnecessary wall to wall step that took up space making the bathroom look smaller that it is.  Also the plumbing access panel appeared to be an after thought and had a nice cover that slid around.  Again the gold plumbing fixtures needed updating.

Demo begins……

        rotate_1004101153c           1006101256

       1006101256a    rotate_1006101257

Reconstruction:

                               rotate_1009102123                             

                                        The frame was built to support the new soak tub.

                      1009102122  

                                      Pictured here you can see the threshold for the shower.

                         1020101245

                                             Jeff installed the valve for the new shower fixture.

           1020101607

Pictured above you see the preparations for the corner  shelf design Jeff pitched to Meredith to maximize shelf space.  Also he moved the electrical as to bypass where the shelving would go.

                            rotate_1016101504

    Jeff supervised and coached me through grading this shower pan while he mix and poured the concrete.

                          rotate_1016101551

                           And we have a shower pan! The grading is finished and we wait for it to dry.

                          rotate_1023101328

              With the shower pan completed we were able to install the M-bloc (mold resistant drywall).

    rotate_1023101747    1025100947

Jeff taped and mudded the joints using thin set. Here is a close up of the corner shelf before the tile is installed.

              1025101559a

While we waited for the tub to arrive which was special ordered, Jeff took advantage of this time to run the wiring for the new vanity lighting.  Jeff also saw the need for an additional power outlet on the left side of the vanity since there was only one on the right side, so Jeff spliced into the existed power outlet. (remember this bathroom is for 2)

    1115101536      rotate_1115101536a

Also as we waited for the tub to be delivered we started the tiling around the tub area.  Once the tub arrived we were able to install the tub and finish the plumbing. Once we had the plumbing done we could finish the tile around the tub, and in the shower area.

1117101942        rotate_1204101453

Next Jeff installed the custom ordered vanity cabinets, the counter top, and penny tile backsplash.  Then the baseboards were installed followed by the new dual flush water efficient toilet.

 1208101603     IMG_0068

Here you can better see the penny tile backsplash which we also used to accent the shower.  Jeff was able to use the old mirror and did a custom frame that merges nicely with the framing on the backsplash.  You can see the new faucets have been installed as well.

 


The over-all final product:

 

   IMG_0041       IMG_0071 

      tub       IMG_0059   

                     IMG_0064

      We decided to not replace the medicine cabinet, and instead dry wall and create a simple open shelf.

                         IMG_0070

Close up of the corner shelf in the shower and a better view of the accent tile. Jeff really wanted to use strips of the gray tile to help make the penny tiles pop.  I think it frames it well and pulls it all together nicely.

IMG_0068

IMG_0067

IMG_0069