Friday, July 9, 2010

Manning Home Improvements....

This main level remodel is only one of the first major projects done for the Mannings.

Jeff installed recessed lighting on the lower level living area...


















This was at one time a wet bar...which jeff would soon transform into an entertainment center























He custom made the fabric panelled doors...























and built the entertainment center into the wall



















Here it is finished.























This was the existing hand railing on the stairs



















and the original stair runner



















prep work of installing railing on the kitchen nook area



















now with one set of railings




















Jeff stripped the stairs and put nice wood pieces on with some trimming



















And a nice railing
























Which finishes it off nicely.























Now the fireplace wall was brick from floor to ceiling, they wanted to get rid of all the brick, add some shelving and do a nice granite hearth.



















so jeff drywalled over the top half



















Centered and built the hearth right over the existing brick hearth



















Framed and built the nice deep shelving. And the beautiful natural wood you see is cedar.



No comments:

Post a Comment